in3g
E-MAIL
info@in3g.net
GUANGDONG

Guangdong Tianyuan Architectural Design Co., Ltd.

 Date: 2021-08-16 View: 307
ADDRESS:6th Floor, 10th Floor, 11th Floor 02A, 20th Floor, Yingfeng Business Center, No. 8 Yixing Road, Junlan Community, Beijiao Town, Shunde District, Foshan City, Guangdong Province (residence declaration)

BUSINESS SCOPE: Construction industry (construction engineering) Grade A: It can undertake the corresponding scope of Grade A special engineering design business in architectural decoration engineering design, building curtain wall engineering design, light steel structure engineering design, building intelligent system design, lighting engineering design and fire protection facility engineering design , Can be engaged in the corresponding construction project general contracting business and project management and related technical and management services within the scope of the qualification certificate; the special level B of landscape engineering design; the level C of municipal road engineering; the level of urban and rural planning preparation service, that is The whole country undertakes the following tasks: (1) Preparation of overall plans for towns and cities with a population of less than 200,000; (2) Preparation of special plans for towns, cities where the registered population is located, and cities with a population of less than 1 million; (3) Preparation of detailed plans (4) Preparation of township and village planning; (5) Feasibility study of construction project planning and site selection (the above operating projects shall be operated with valid qualification certificates); soft decoration design and soft decoration engineering; sales: furniture, ornaments, sculptures , Lamps, curtains, carpets, decorative paintings, fabrics and home textiles, household appliances, household items, daily necessities, hardware products, arts and crafts (excluding ivory products). (The above projects do not involve special management measures for foreign investment access) (Projects that require approval in accordance with the law can only be carried out after approval by the relevant departments.) (Projects that require approval in accordance with the law can only be carried out after approval by the relevant departments) 〓

E-MAIL:tymd@midea.com.cn
0Support
0Opposition